Projects

Every project CER designed, advised or researched since 2010 — from 100 kWp island mini-grids to an 85 MWp solar park. The role CER played is listed with each one.

22 solar mini-grids, 4.54 MWp 6 grid-tied solar parks, 141.58 MWp 21 rooftop systems, 30.85 MWp

Background: UIU's campus at United City, Dhaka, beside the canal.

Grid-tied solar park

Project Location Capacity Year CER role
NWPGCL Bank of the Jamuna, Sirajganj 7.8 MWp Mar 2021 Sole consultant: feasibility, conceptual design, CoD and plant acceptance testing supervision
BPDB Kaptai Kaptai, Rangamati 7.4 MWp May 2019 Team leader, national consulting team
Sympa Tetulia, Panchagarh 10.3 MWp Jul 2019 Consultant for feasibility study
ESSPL Sarishabari, Jamalpur 3.28 MWp Aug 2017 Designer
TSEL Teknaf, Cox's Bazar 27.8 MWp — Team leader, technical audit
BCRECL Soydabad, Sirajganj 85 MWp — Lender's engineer