Projects
Every project CER designed, advised or researched since 2010 — from 100 kWp island mini-grids to an 85 MWp solar park. The role CER played is listed with each one.
Background: UIU's campus at United City, Dhaka, beside the canal.
Grid-tied solar park
| Project | Location | Capacity | Year | CER role |
|---|---|---|---|---|
| NWPGCL | Bank of the Jamuna, Sirajganj | 7.8 MWp | Mar 2021 | Sole consultant: feasibility, conceptual design, CoD and plant acceptance testing supervision |
| BPDB Kaptai | Kaptai, Rangamati | 7.4 MWp | May 2019 | Team leader, national consulting team |
| Sympa | Tetulia, Panchagarh | 10.3 MWp | Jul 2019 | Consultant for feasibility study |
| ESSPL | Sarishabari, Jamalpur | 3.28 MWp | Aug 2017 | Designer |
| TSEL | Teknaf, Cox's Bazar | 27.8 MWp | — | Team leader, technical audit |
| BCRECL | Soydabad, Sirajganj | 85 MWp | — | Lender's engineer |